Deck building

Deck Building Estimate Template (Free)

Short answer

A deck estimate needs the deck dimensions and height, framing and decking priced per square foot with the material named, railing per linear foot, stairs per riser, footings per unit, demo and disposal, permit and inspection at cost, a written payment schedule with a materials deposit and a framing draw, and an exclusions list. Copy the template below, or use software that saves those rates and bills the draws.

What belongs on the estimate

  • Business name, license number, contact info
  • Customer name, property address, phone
  • Deck dimensions, height above grade, and attachment method
  • Framing and decking — per square foot, material named
  • Railing, stairs, footings — each its own unit
  • Demo and disposal
  • Permit and inspection — at cost
  • Payment schedule and exclusions

The template

[Your Business Name] · License #________
[Phone] · [Email]

Estimate #____        Date: __________
Prepared For: [Customer Name]   Phone: __________
Property: _____________________________________
Deck: ____ ft x ____ ft (___ sq ft)
Height above grade: ____ ft   Attached: [y/n]

--------------------------------------------------
Description                              Amount
--------------------------------------------------
Demo + disposal of existing deck         $______
Footings — ___ @ $___ (depth ___ in)     $______
Framing — ___ sq ft @ $___               $______
   (joist spacing ___ in, [material])
Decking — ___ sq ft @ $___ [material]    $______
Railing — ___ lf @ $___ [style]          $______
Stairs — ___ risers @ $___               $______
Landing / platform                       $______
Skirting / lattice                       $______
Built-in bench / planter                 $______
Deck lighting (fixtures only)            $______
Permit + inspection (at cost)            $______
--------------------------------------------------
Subtotal                                 $______
Tax (if applicable)                      $______
Estimate Total                           $______

PAYMENT SCHEDULE
  ___% materials deposit at signing       $______
  ___% draw at framing inspection         $______
  Balance at final walkthrough            $______

NOT INCLUDED: lawn/landscape restoration, electrical
wiring, staining/sealing unless listed, drainage or
grading, structural repairs found under existing deck.
Valid ___ days. Change orders require written approval.

Say what happens under the old deck

Rot at the ledger, buried debris, and a foundation that isn’t what anyone expected are routine discoveries. Excluding them explicitly — and stating an hourly or unit rate for repairs — turns a discovery into a change order rather than a renegotiation.

Quote three tiers on one layout

Pressure-treated, cedar, composite. Same drawing, three prices. It’s probably the most effective thing you can put on a deck estimate, because it moves the decision from whether to build to what to build with.

Skipping the copy-paste

Software with your framing, decking, railing, and stair rates saved builds this estimate in minutes and turns the accepted version into a deposit invoice and scheduled draws.

Frequently asked questions

Why print the payment schedule on the estimate?

Because it's the part customers most need to see before they sign, and the part that's most awkward to introduce afterward. A deposit and a framing draw stated on the estimate are normal; the same request made after demo has started sounds like trouble.

What should the exclusions cover?

Landscape and lawn restoration, electrical for lighting, painting or staining if not quoted, drainage or grading work, and anything discovered under the old deck. These are the five things customers most often assume are included.

Should I quote more than one material tier?

Yes — good-better-best on the same layout. It reframes the conversation from 'is this too expensive' to 'which one', and a real share of customers pick the middle or top tier once they can see the difference priced out.