Boat shrink wrapping

How Much to Charge to Shrink Wrap a Boat

Short answer

Shrink wrapping is priced per foot of length overall, commonly in the $12–$25/ft range depending on region, boat type, and size band, with vents, access doors, and mast-up work added separately. Pontoons and deck boats usually carry a flat surcharge, and spring removal and disposal is quoted as its own service.

The base rate

$12–$25 per foot of LOA is the common range, with region and boat type moving you within it. Set your rate in size bands rather than one flat number.

Size bandBasis
Under 20’Lower per-foot rate
20’–29’Step up
30’–39’Step up again
40’+Quoted per boat

What adds to it

  • Vents — priced each, several per boat
  • Zippered access door — priced each, the largest single add-on
  • Mast up — a per-foot surcharge, not a flat fee
  • Pontoon / deck boat — a flat surcharge for the awkward frame
  • On-site wrapping at the customer’s driveway rather than your yard

Spring removal is its own job

Quote removal and disposal separately. Film disposal costs money, the labor is real, and a fall price that silently included it is a price you set too low.

Take a deposit

The season is six weeks long and a no-show is a slot you can’t refill. A deposit at booking, charged when the customer accepts the quote, is what makes the schedule real — see boat shrink wrapping business software.

Frequently asked questions

Should the per-foot rate change with boat size?

Yes, in bands. A 38-footer takes more film, more staging, and more time per foot than a 20-footer, so most operators step the rate up every ten feet rather than using one number for everything.

What should vents and access doors add?

Each vent is a small per-unit charge and a zippered door is a larger one, both priced individually. They're the difference between a wrap that survives the winter and one that doesn't, so they're worth naming rather than absorbing.

How do I price a sailboat with the mast up?

As a per-foot surcharge on top of the base rate. Framing around a standing rig takes materially more time and film, and a flat surcharge understates it on longer boats.

Should removal be included in the fall price?

Quote it separately — either as a prepaid line in the fall or a spring invoice. Silence on removal is the single most common source of spring arguments in this trade.