Tuckpointing Estimate Template (Free)
A tuckpointing estimate needs the wall elevations and square footage being repointed, grinding depth, the mortar mix and whether matching is required, brick replacement by unit, access method — ladder, scaffold, or lift — cleaning and optional sealing, protection of surroundings, and an exclusions list covering structural repair and interior damage. Copy the template below, or use software that saves those rates and bills progress draws.
What belongs on the estimate
- Business name, license number, contact info
- Customer name, property address, phone
- Elevations included — north, south, east, west, and square footage each
- Grinding depth and method
- Mortar — mix type, matching required or not
- Brick replacement — per-unit rate, salvage sourcing
- Access — ladder, scaffold, or lift
- Cleaning, sealing, protection
- Payment schedule and exclusions
The template
[Your Business Name] · License #________
[Phone] · [Email]
Estimate #____ Date: __________
Prepared For: [Customer Name] Phone: __________
Property: _____________________________________
Building age: ______ Brick type: ______________
Elevations: [N ___ sq ft] [S ___ sq ft]
[E ___ sq ft] [W ___ sq ft]
Total repointing area: ______ sq ft
--------------------------------------------------
Description Amount
--------------------------------------------------
Setup + protection (windows, plants) $______
Access: [scaffold / lift / ladder] $______
Rental — ___ days @ $___ $______
Joint grinding — ___ sq ft, ___ in depth $______
Mortar matching + test batch $______
Repointing — ___ sq ft @ $___ $______
Spot repointing — ___ lf @ $___ $______
Brick replacement — ___ @ $___ each $______
Salvage brick sourcing $______
Lintel / shelf angle repair $______
Chimney crown / cap repair $______
Chemical cleaning — ___ sq ft $______
Water repellent sealer (optional) $______
Debris disposal + cleanup $______
--------------------------------------------------
Subtotal $______
Tax (if applicable) $______
Estimate Total $______
PAYMENT SCHEDULE
___% deposit at signing $______
___% draw at ___% of area complete $______
Balance at completion $______
NOT INCLUDED: structural repair, foundation work,
interior plaster or drywall damage, window or door
replacement, painting, landscape restoration.
Valid ___ days. Weather delays may extend schedule.
Break it out by elevation
“Repointing — $9,400” is just a number. Four elevations with square footage listed for each is a scope. It also lets a customer phase the work — do the weather-facing side this year and the rest next — which turns a declined bid into a booked one more often than you’d think.
Note the weather clause
Mortar can’t be placed below certain temperatures or in driving rain, so say so on the estimate. That way a delayed start reads as craftsmanship instead of unreliability.
Skipping the copy-paste
Software that already has your grinding, repointing, and access rates saved will build this out per elevation and schedule the deposit and mid-job draw off the same record.
Frequently asked questions
Should I quote by wall face or by joint?
Wall face square footage for full repointing, linear foot of joint for spot repairs. Mixing the two on one estimate confuses the customer and makes it impossible to compare against another bid — pick the one that matches the work.
Why state the grinding depth?
Because it's the main quality difference between bids and it's invisible afterward. Grinding to two and a half times the joint width versus scratching the surface is a different job with a different lifespan — printing your depth is the cleanest way to explain a higher price.
How do I handle brick that crumbles when I start?
State a per-unit replacement rate on the estimate, billed with photo approval. Deteriorated brick behind failed mortar is a routine discovery, and pricing the rate in advance turns it into a change order rather than a renegotiation on scaffold.